From First Call to Power On
Here's exactly what happens. No surprises. No confusion.
5-step process
-
1
Free Consultation with Chris
Call, text, or fill out the form. Chris personally reviews your situation. No pressure, no obligation. Discuss your goals, budget, timeline, and any solar concerns.
- ~15-30 minute conversation
- Chris answers every question in plain English
- If solar doesn't make sense, he'll tell you
-
2
Home Assessment
Professional site survey: roof condition, shade analysis, solar potential, electrical panel inspection.
- 30-60 minute on-site visit (or remote via satellite)
- Roof age + condition flagged for Smart Bundle eligibility
- Shade analysis identifies optimal panel placement
- Electrical panel checked for capacity
-
3
Chris Shops the Market
Chris reaches out to vetted NJ companies. Gets competing quotes for your specific home. Compares pricing, equipment, warranties, and timelines.
- Typically 3-5 quotes from vetted installer partners
- Side-by-side comparison sheet you can keep
- Chris flags red lines (escalator clauses, vague warranties)
-
4
You Choose, Chris Manages
Review quotes side-by-side with Chris's guidance. He handles all paperwork: permits, utility applications, SREC registration, interconnection. Approvals typically take ~45 days.
- Chris walks you through the contract line by line
- Permits filed with your municipality
- SREC-II registration submitted
- Utility interconnection application processed
-
5
Installation & Savings
Professional installation (typically one day). Final inspections. Utility grants permission to operate. System goes live — you start saving. Chris checks in afterward to make sure everything's working perfectly.
- 1-2 day install (3-5 days if Smart Bundle includes roof)
- Municipal + electrical inspections
- Utility PTO (Permission To Operate)
- System monitoring setup; Chris confirms first month's production